Scheduling Queries
With the Schedule Query screen, you can specify when a query is to run by adding it to schedule groups (as shown in Defining Groups of Items) or removing it from them.
To schedule a query, type S in the Opt field for that query on the Work with Queries screen (
The screen also appears in the process of adding or modifying queries if the Schedule Query field on the Exit Query Definition screen is set to Y (as shown in Adding and Modifying Queries).
|                                  Schedule Query  Query . . . . . TESTJZ  Test for Documentation   Type options, press Enter.  1=Add   4=Remove  Opt  Group  Description       A   TEXT FOR A      DAILY   Daily      DAILYGU  Daily, for GUI output (EXCEL like, preformatted)      DAILYML  Daily, in HTML, sent by Email      GUI   TEXT FOR GUI     > QQ   Test      RR   TEXT FOR RR      TELNET   Check of Z6TELNET Quiery      TSTDAY   Daily     > TSTGRP   Test group   More...  F3=Exit  F12=Cancel   | 
The read-only Query field shows the name and text description of the query being scheduled.
The body of the screen contains a line for each of the existing schedule groups. In each, the Group field shows the name of the group and the Description field shows a text description.
If a group contains the query being scheduled, its Group field is preceded by an open-arrow (the ">" character).
To add the query to a schedule group, type 1 in the Opt field for that group and press Enter.
To remove the query from a schedule group, type 4 in the Opt field for that group and press Enter.
