Running Report Groups On Demand

To run report groups on demand, select 52. Run a Report Group from the Reporting menu (STRFW > 41), as shown in Creating and Running Firewall Queries and Reports

To run a report group on demand from within the Report Scheduler (as shown in Scheduling Reports), type 5 in the Opt field for the report group and press Enter.

   ​       ​  ​      ​        Run Report Group (RUNRPTGRP)        ​                  
 ​
  ​       ​  ​                                                                    
 Type choices, press Enter.​                                                     
                                                                                
 Report group . . . . . . . . . .​  ​              ​ Name                          
 Job description  . . . . . . . .​  ​ QBATCH       ​ Name, *NONE                   
   Library  . . . . . . . . . . .​    ​ *PRODUCT    Name, *PRODUCT, *LIBL...      
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                 ​
        Bottom​ 
 F3=Exit   F4=Prompt   F5=Refresh   F12=Cancel   F13=How to use this display    
 F24=More keys                                                                 ​
 
                                                                                

If you have selected the screen from within the Reporting menu, enter the name of the report group (as set within the Report Scheduler) in the Report group field.

The Job description field contains the name of the program to run. To run the report group interactively, enter *NONE.

The Library field contains the name of the library containing the program. This can be a library name or *PRODUCT, *LIBL, or *CURLIB.